Metwide Communications
Network Rack Remediation After Water Damage for Liverpool Girls High School

Network Rack Remediation After Water Damage for Liverpool Girls High School

Replacing water-damaged patch panels and re-terminating structured cabling to restore a clean, reliable and properly labelled communications rack.

1300 300 210
Licensed & Certified
Same Day Free Quote

Project Overview

Client: Liverpool Girls High School

Location: Liverpool, NSW

Project Summary: Liverpool Girls High School required urgent remediation works after water damage affected the communications rack within the administration office. The existing patch panels and associated patch leads needed to be replaced to restore a clean, reliable and properly labelled network environment.

The project involved a careful audit of the existing structured cabling layout, removal of the damaged patch panels, re-termination of cabling, replacement of patch leads and replication of the existing patching configuration to minimise disruption to school operations.

Communications rack with newly installed patch panels and organised cabling at Liverpool Girls High School

The Challenge & Our Solution

The Challenge

  • The communications rack supported critical school network services, so every cable and port had to be identified before any equipment was removed.

  • Because the cabling had been patched into Aruba switching equipment, the correct network layout, port mapping and labelling structure needed to be maintained throughout the replacement.

Our Solution

  • Our technicians completed a full audit of all existing patch leads and termination points before any equipment was removed, identifying, labelling and mapping each cable back to the relevant switch port.

  • The affected patch panels were removed and replaced with new fully loaded CAT6 and CAT6A patch panels, with all cabling re-terminated, labelled and patched back to match the original working configuration.

  • Cable management was improved using new patch leads, Velcro, labels and rack management accessories.

Work Completed

Full Route Audit

Audited all existing patch cable routes and switch connections before any equipment was removed.

Patch Panel Replacement

Replaced the damaged CAT6 and CAT6A patch panels with new fully loaded panels.

Cabling Re-Terminated

Re-terminated the existing structured cabling into the new patch panels.

Colour-Matched Patch Leads

Replaced patch leads with new colour-matched patch cables for clear, consistent patching.

Labelling Replicated

Replicated the existing port labelling and patching layout to match the original configuration.

Cable Management Improved

Improved cable management within the communications rack for a neater, more maintainable finish.

Connectivity Tested

Tested and confirmed network connectivity across the rack before handover.

Key Outcomes

Rack Restored

The administration communications rack was returned to a clean, serviceable and reliable condition.

Easier Future Maintenance

Organised cable management and replicated labelling make future maintenance and fault-finding faster.

Reduced Fault Risk

Replacing the water-damaged panels and leads reduced the risk of ongoing network faults.

Minimal Disruption

Replicating the original patching layout kept disruption to school operations to a minimum.

Need Data Cabling or Rack Remediation for Your School?

From structured cabling and patch panel replacement to full communications rack remediation, Metwide keeps school networks reliable and well documented. Contact us to discuss your site.

1300 300 210
Response within 24 hours
Need Data Cabling or Rack Remediation for Your School?